PRODUCTIVITY

SHEET PILING JOB REPORT

CRAMEC Side – Grip against 25% – 100% Stronger End – Grip vibrators.

Job report of 800 000 m (2,4 milj. feet) Sheet-Piling job.

RaMeC SGV 90 Exc. mountable vibrator Crane suspensable vibrator
Excavator or Crane Hyundai 330 Hyundai 420 Liebherr crawler crane
Vibration power 97 kW 123 kW > 200 kW
Measured performance 40–50 m/hr 20–22 m/hr 25–30 m/hr
Straightness of the pile Very straight Problems in "R" direction Problems in X,Y,Z and "R" directions
Manpower needed 1–2 men 4–5 men 4 men
Driving anchors 12m (36ft) anchor in 15 minutes – no problem Not possible Not possible
Fulfilling safety regulations Yes Very much extra work needed Very much extra work needed

ANCHORING AT 45°